| Province | Subbasin | % |
|---|---|---|
| Blue Mountain | Grande Ronde | 100.00% |
| Previous: | Next: |
|---|---|
| n/a |
* Expenditures data includes accruals and are based on data through 31-Jan-2026.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| N/A - NO deliverable | A: 165. Environmental Compliance | 05/31/2022 | 05/31/2022 | |
| Task 3 - Final Ground Control Points, Map and Description | B: 115. Small Unmanned Aerial System - Professional Survey | 05/31/2022 | 09/30/2021 | |
| Task 4: Study Conclusions and Final report for sediment study | C: 115. Upper Grande Ronde Sediment Budget | 05/31/2022 | 05/31/2022 | |
| HSI Tool in R-script | D: 115. Habitat Suitability Index Tool | 05/31/2022 | 05/31/2022 | |
| Upper Grande Ronde Stage Floodplain Assessment | E: 115. Upper Grande Ronde Stage-0 Floodplain Enhancement Demonstration Project | 05/31/2022 | 05/31/2022 | |
| Effective implementation management and timely contract administration | F: 119. Manage and Administer this contract | 05/31/2022 | 05/31/2022 | |
| Hydraulic Study Deliverables | I: 115. Phase 1 Hydraulic and Phase 2 Habitat Evaluation | 05/31/2022 | 05/31/2022 | |
| Final Report | J: 115. Grande Ronde Valley Water Quality Assessment | 05/31/2022 | 05/31/2022 | |
| Processing & Deliverables | K: 115. LiDAR Evaluation - Quantum Spatial, Inc. (QSI) | 01/31/2022 | 05/11/2021 | |
| Project Performance Evaluation Work Flow and Completed 2021 Geographic Review Proposal | L: 115. Implementation Performance and Geographic Review | 05/31/2022 | 05/31/2022 | |
| Valley Bottom Restoration and Carrying Capacity Comparisons to Support Project Implementation | M: 115. Valley Bottom Restoration and Carrying Capacity Comparisons | 05/31/2022 | 05/31/2022 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Environmental Compliance | |||||||
| B | 115 | Small Unmanned Aerial System - Professional Survey | 11/25/2020 | ||||||
| C | 115 | Upper Grande Ronde Sediment Budget | 11/25/2020 | ||||||
| D | 115 | Habitat Suitability Index Tool | |||||||
| E | 115 | Upper Grande Ronde Stage-0 Floodplain Enhancement Demonstration Project | |||||||
| F | 119 | Manage and Administer this contract | |||||||
| G | 132 | Progress Report - NA | |||||||
| H | 185 | Periodic Status Reports for BPA | |||||||
| I | 115 | Phase 1 Hydraulic and Phase 2 Habitat Evaluation | |||||||
| J | 115 | Grande Ronde Valley Water Quality Assessment | |||||||
| K | 115 | LiDAR Evaluation - Quantum Spatial, Inc. (QSI) | |||||||
| L | 115 | Implementation Performance and Geographic Review | 11/25/2020 | ||||||
| M | 115 | Valley Bottom Restoration and Carrying Capacity Comparisons |